Assignment:
You have developed the following simple product structure of items needed for your gift bag for a rush party for prospective pledges in your organization. You forecast 200 attendees. Assume that there is no inventory on hand of any of the items. Explode the bill of material. (Subscripts indicate the number of units required.)
Your answer must be, typed, double-spaced, Times New Roman font (size 12), one-inch margins on all sides, APA format and also include references.