Several kids are on a sled pulled by a four-wheeler across


Several kids are on a sled pulled by a four-wheeler across a level snow-covered field. The sled is moving at a fix speed of 9.00 m/s, and the tow rope (parallel to the ground) creates an angle of 35.0 degree with respect to the velocity of the sled. If the tension in the rope is 38.0 Newton, compute the work done on the sled by the tension in the rope in 12.0 second.

Request for Solution File

Ask an Expert for Answer!!
Physics: Several kids are on a sled pulled by a four-wheeler across
Reference No:- TGS0929023

Expected delivery within 24 Hours