A decision maker wishes to maximize total benefit, B = 3x + xy + y subject to the cost constraint, C = 4x + 2y = 70.
Setup the Lagrangian and then determine the values of x and y at the minimum level of benefit, given the constraint.
What are the maximum benefits?