Sand moves without slipping at v = 5.9 m/s down a conveyer that is tilted at θ = 15o. The sand enters a pipe h = 3.4 m below the end of the conveyer belt, as shown in the figure below. What is the horizontal distance d between the conveyer belt and the pipe?