Answer the following:
1. In a two-dimensional risk assessment matrix, risk is the combination of probability and __________.
a. severity
b. frequency
c. loss
d. exposure
2. Which type of safety analysis model is used to define relationships among variables and constants?
a. Physics
b. Physical
c. Graphic
d. Mathematical
3. In a two-dimensional risk assessment matrix, risk is the combination of probability and __________.
a. severity
b. frequency
c. loss
d. exposure
4. Which of the following is not one of Bloom's six levels of development?
a. Comprehension
b. Efficacy
c. Synthesis
d. Evaluation
5. Public health funding for injury prevention efforts is low due to the general public and legislatures believing that injuries are which of the following?
a. Preventable
b. Costly
c. Inconsequentia
d. Inevitable