Respond-critical path method


Assignment:

"Critical Path Method (CPM)" Please respond to the following:

• The Critical Path Method can be used as a project management tool for determining the durations and slack times of project activities. Describe how this tool can be used to recover from schedule overruns of specific activities that are not on the critical path. Provide an example to justify your answer.

• Analyze how the Program Evaluation and Review Technique (PERT) method may be used in conjunction with CPM to schedule activities throughout the project life cycle.

Classmate:

The Critical Path Method can be used as a project management tool for determining the durations and slack times of project activities. Describe how this tool can be used to recover from schedule overruns of specific activities that are not on the critical path. Provide an example to justify your answer.

The project manager needs to identify the paths and activities that contribute most to the likelihood of schedule overrun. While using CPM analysis on the path between two tasks, both tasks must be on the critical path. The longest path through a network determines the project's duration. Therefore, the critical path must be shortened to save time. Hence, schedule overrun is solved.

https://www.peterjoubert.com/how-to-handle-project-schedule-overruns/

Analyze how the Program Evaluation and Review Technique (PERT) method may be used in conjunction with CPM to schedule activities throughout the project life cycle.

Business owners and managers often use CPM and PERT in tandem because they help these professionals visualize and simplify larger projects. They both make it easier to see relationships and dependencies between tasks and are useful in estimating how long a project will take. While the CPM assigns a single time interval between tasks, using PERT along with it can help you anticipate where delays are likely to occur.

https://smallbusiness.chron.com/pert-cpm-work-69516.html

Solution Preview :

Prepared by a verified Expert
Management Information Sys: Respond-critical path method
Reference No:- TGS01993992

Now Priced at $20 (50% Discount)

Recommended (90%)

Rated (4.3/5)