#quesXERCISE 3-15 Departmental Overhead Rates [LO1, LO2, LO3]
Diewold Company has two departments, Milling and Assembly. The company uses a job-order costing system and computes a predetermined overhead rate in each department. The Milling Department bases its rate on machine-hours, and the Assembly Department bases its rate on direct labor-hours. At the beginning of the year, the company made the following estimates:
Required:
1. Compute the predetermined overhead rate to be used in each department.
2. Assume that the overhead rates you computed in (1) above are in effect. The job cost sheet for Job 407, which was started and completed during the year, showed the following:
Compute the total manufacturing cost assigned to Job 407.tion..