Q. Show the Accept-Reject Criteria?

Accept-Reject Criteria:-

  • If the actual payback period is not more than the predetermined payback period...................... Project would be accepted.
  • If the actual payback period is in excess of the predetermined payback period...................... Project would be rejected.

 