Q. Explain Intermediate and Detailed COCOMO model?
Intermediate COCOMO calculates software development effort as function of program size and a set of cost drivers that include subjective assessment of hardware, product, personnel and project attributes. This extension considers a bunch of four "cost drivers" every with a number of subsidiary attributes:-
- Required software reliability
- Size of application database
- Complexity of the product
- Run-time performance constraints
- Memory constraints
- Volatility of the virtual machine environment
- Required turnabout time
- Analyst capability
- Software engineering capability
- Applications experience
- Virtual machine experience
- Programming language experience
- Use of software tools
- Application of software engineering methods
- Required development schedule