Q. Explain Accept-Reject Criteria?

Accept-Reject Criteria:-

  • If actual ARR is elevated than the predetermined rate of return .......................Project would be accepted.
  • If actual ARR is lesser than the predetermined rate of return .......................Project would be rejected.

 