Discussion:
Question 1
In operations management, _____ refers to completing a task or producing a product at the lowest cost.
Question 2
_____ software enables users to test, analyze, and optimize designs. These programs allow users to find and correct design flaws before production.
Question 3
_____ production emphasizes production of goods to meet actual current demand, therefore minimizing the need to hold inventories of finished goods and work-in-process.
Question 4
_____ software provides powerful drawing and drafting tools that enable users to create and edit blueprints and design drawings quickly and easily. These programs allow users to create three-dimensional drawings.
Question 5
_____ software takes the electronic design for a product and creates the programmed instructions that robots must follow to produce a product as efficiently as possible.
Question 6
_____ is the set of strategies and practices to eliminate waste.
Question 7
In project scheduling terminology, _____ are activities that must be completed before other activities can begin.
Question 8
_____ can be produced independently of the consumer and then stored and shipped.
Question 9
Most manufacturing firms are concerned about the availability of reliable electricity and water supplies when making location decisions. These considerations deal with the:
Question 10
Background music, lighting and the use of scents are all factors of ____________ in servicescape designs.