Problem: Boehm Compressors uses a lean production assembly line to make its compressors. In one assembly area, the demand is 100 parts per eight-hour day. It uses a container that holds eight positions. It typically takes about six hours to round-trip a container from one work center to the next and back again. It also desires a 15% safety stock of this part in the system.