Assignment
The following steps should guide the write-up of the cost benefit analysis:
Cost Benefit Analysis Steps
- Present the Objective of the Project
- Examination of the Relevant Alternatives
- Select 3 Criteria and briefly define (Use the criteria in a decision matrix and a weighted score table)
- Identification of Costs and Benefits - indirect vs. direct
- Measurement of Costs and Benefits
- Determine Net Benefits (Use a Generic Cost Benefit Calculation)
See the CBA example to get an idea about how to layout your table. There should be a 1to 2pp write-up and interpretation of the results.
The response should include a reference list. Double-space, using Times New Roman 12 pnt font, one-inch margins, and APA style of writing and citations.
Attachment:- Cost-Benefit-Matrix-Template.rar