1. Determine the following.
a. Predetermine overhead rate for year 2011
b. Total overhead cost applied to each of the six jobs during year 2011
c. Over- or underapplied overhead at year-end 2011
2. Assuming that any over- or underapplied overhead is not material, prepare the adjusting entry to allocate any over- or underapplied overhead to Cost of Goods Sold at the end of year 2011