Prepare report to satisfy business requirements


1. Project Activity Report

In this assessment task, you are required to gather, determine and confirm client requirement and review available network technologies, devices and protocols to build WLAN (Wireless Local Area Network) for small office or home office network by choosing appropriate hardware and software in accordance to business and technical requirements including installation plan, network design and security.

Introduction:

Devon Education is a growing educational provider. It has been operating since 2010. Its main business is to provide vocational training and education for international students. With further growth in business, BEG has decided to open new office in Brisbane.

Key Project objectives:

Furthermore, after your meetings and interviews with Andre, Johnson and Angela, following information were collected.

  • Each staff member will have complete desktop, access to printer, wireless and NAS
  • Staff should be able to use the network securely.
  • Data in Network Access Storage (NAS) should be able to share between all staff.
  • Hardware and software should be of industry standards.
  • Router and WAP must be regularly monitored and backed up.

Tasks: Prepare a Report

Research and prepare a report for Brisbane Education Group to satisfy the business requirements for BEG,

You report must contain:

  • Cover page
  • Table of Contents (Refer to sample Table of Content)
  • Number all pages at the bottom centre of the page
  • Include your course, name and student number as a header at the top of each page.
  • Use 1.5 line spacing (other guides may prefer double spacing)
  • Use the Times New Roman font at either 11pt or 12pt size
  • Either have a line space between paragraphs or indent the first line of each Paragraph.1. Introduction:

This section should cover what the report is all about, and what are the main areas the report will cover that may include specifications, features, functionalities, prices etc.

2. Data Gathering Techniques:

Discuss your findings on the data gathering techniques used to gather critical business and systems requirements. This section must cover the following:

  • List two different techniques/methods used in this information gathering and explain
  • What are the questions?
  • List the issues uncovered in this investigation
  • What changes are required to the current infrastructure to implement new systems

Complete the attached Appendix 1.

3. Request System Access

Draft an email to be sent to IT manager requesting to be given access to server systems.

4. Network Infrastructure:

Create a hardware and software requirements details based on various data gathering techniques used. You should include all the required hardware (including WAN, LAN, Wireless and cabling), and software requirements. (Including application software and Operating System).

5. Cabling Requirements:

The Brisbane office has 7 rooms al located on the first floor. The floor size for each room is shown in the below floor plan.

In this section you will need to answer the following:

  • Type of cable to be used
  • Approximate length of the cable
  • List the OH&S issues that must be looked into
  • List the building and government guidelines to consider during the cabling

6. Design Considerations:

The Brisbane office currently has an existing LAN network with 7 PC's. The infrastructure requirements must address the following:

  • List the network design consideration which should be considered so that the existing network does not have any impact on the proposed new network.
  • List the WAN design consideration based on organisational guidelines
  • List the Wireless Network design consideration based on organisational guidelines

7. Hardware and Software Evaluation:

Based on the client requirements, compare and evaluate Two (2) each of the hardware recommended in terms of their:

  • Performance
  • Functionalities
  • Cost
  • Licensing

For costing, you must include quotation. Please see the Appendix 2provided.

You will need to contact vendors and refer to appropriate resources to obtain technical specifications and cost of the hardware and software required.

8. Network Diagram - (Should include Router/WAP, Clients, and Printers)

9. Topology:

In this section, you will need to provide information about the topology to be used in the scenario provided. 

10. Network Configuration (IP Addressing scheme)

In this section you will need to plan and answer the following:

  • Class network address
  • Network address
  • Host address
  • Subnet mask
  • Services to be installed, for instance, File Service, Print Service, DHCP, DNS etc.
  • Suitable protocols to be used with the capabilities and features, TCP/IP for instance

11. Internet (WAN) connection

In this section, you will need to provide recommendation about the Internet Service Providersas per the client's requirements. Include the following:

  • Cost of service per month
  • Download bandwidth per month
  • Vendor
  • Contractual agreements

12. Security Threat Detection and Testing

In this section, you will need to investigate on possible security issues the business might face in future and recommend on strategies to avoid such risks. You must include the following:

  • List the risks
  • Discuss on the strategies to implement to avoid those risks such as

o Intrusion Detection and penetration testing techniques

o Authentication methods

o Network protocols and data encryption

13. Backup Plan

In this section, you will need to recommend on the back up strategies as per the client requirements. Discuss on the recommendation such as Daily backup, Incremental backup, Differential backup, or Cloud backup etc.

14. Review and Sign off Form

In this task, you need to conduct a meeting with IT manager. Your trainer will act as an IT manager.

You need to present the prepared report to IT manager to collect feedback and update the report. Once the feedback has been collected, update the report.

Attachment:- Client business requirements.rar

Request for Solution File

Ask an Expert for Answer!!
Computer Network Security: Prepare report to satisfy business requirements
Reference No:- TGS03046677

Expected delivery within 24 Hours