Prepare a work breakdown structure wbs for a spaghetti with


Prepare a Work Breakdown Structure (WBS) for a spaghetti with meatballs dinner that includes a Caesar salad, a loaf of Italian bread, and wine. (Include the different components of the dinner at the upper level and the various detailed work activities required by each component at the lower level)