Prepare a list of lessons learned for other project managers


Assignment: Integrating Processes

Length: 5 pages.

Refer to the case study "Trouble in Paradise".

Answer the following questions:

a) What went wrong?
b) Prepare a list of lessons learned for other project managers.
c) Were there any warning signs that should have indicated an impending disaster?

Note that you will need to calculate cost performance index (CPI) and schedule performance index (SPI) based on the information provided in the scenario. Include your calculations as an attachment.

Format your assignment according to the give formatting requirements:

• The answer must be using Times New Roman font (size 12), double spaced, typed, with one-inch margins on all sides.

• The response also includes a cover page containing the student's name, the title of the assignment, the course title, and the date. The cover page is not included in the required page length.

• Also include a reference page. The references and Citations should follow APA format. The reference page is not included in the required page length.

Attachment:- Wiley.rar

Solution Preview :

Prepared by a verified Expert
Project Management: Prepare a list of lessons learned for other project managers
Reference No:- TGS03088203

Now Priced at $40 (50% Discount)

Recommended (91%)

Rated (4.3/5)