Problem: As a result of potential delays in awarding the contract for the Destination-Coded Vehicle (DCV) baggage-handling system, there is a risk that the terminal's baseline design may be installed and maintained without a finalized design for the baggage-handling system, which could lead to significant rework and increased costs during construction. As a result of potential delays in awarding the contract for the Destination-Coded Vehicle (DCV) baggage-handling system, there is a risk that the terminal's baseline design may be installed and maintained without a finalized design for the baggage-handling system, which could lead to significant rework and increased costs during construction. Rewrite this.