Pile driver is brought to rest


A 2216 kg pile driver is used to drive a steel beam into the ground. The pile driver falls 5.3 m before contacting the beam, and it drives the beam 20 cm into the ground before coming to rest. Using energy considerations, calculate the average force the beam exerts on the pile driver while the pile driver is brought to rest.

Request for Solution File

Ask an Expert for Answer!!
Physics: Pile driver is brought to rest
Reference No:- TGS0145724

Expected delivery within 24 Hours