Outline the steps used to complete the project


PPT Homework: Project Management

The goal of this discussion is to look at goals and milestones as well as the process of breaking big projects into achievable steps. Consider a recent project that you worked on either as a job task or as a volunteer in an organization. Post the goal and a brief description of the project. Outline the steps used to complete this project. Note any failures or successes that were part of the overall process.

Optional: In place of a written text posting, develop and upload a PowerPoint, Youtube, or other media presentation. This presentation should demonstrate how a big project was broken down into achievable steps. A PowerPoint presentation would include 6-10 slides including a title slide and a reference slide. Pictures may also be added. An audio-visual media presentation would be 3-5 minutes in length.

Format your homework according to the give formatting requirements:

a. The answer must be double spaced, typed, using Times New Roman font (size 12), with one-inch margins on all sides.

b. The response also includes a cover page containing the title of the homework, the course title, the student's name, and the date. The cover page is not included in the required page length.

c. Also include a reference page. The references and Citations should follow APA format. The reference page is not included in the required page length.

Solution Preview :

Prepared by a verified Expert
Project Management: Outline the steps used to complete the project
Reference No:- TGS03049666

Now Priced at $20 (50% Discount)

Recommended (94%)

Rated (4.6/5)