Outline the steps involved in undertaking a job search


Homework: Project Planner

Resources: Ch. 16 of Management: A Practical Introduction, Appendix: The Project Planner's Toolkit and the Excel Template

Apply the concepts of the tools described in the Project Planner's Toolkit.

Refer to the Excel Template as an example.

1) After studying and evaluating the components included in the Project Manager's Toolkit, evaluate which of the tools (Gantt Chart or Flow Chart) would be most appropriate for each of the following tasks and use that tool to complete the task.

2) Outline the steps involved in undertaking a job search and choosing a job.

3) Include an analysis of the advantages and limitations of the tool as well as ideas for ways you can use the tool in business.

4) Build a schedule showing the steps for planning and preparing for your vacation.

5) Include a description of the advantages and limitations of this tool and ideas for ways you can use it in business.

Format your assignment according to the give formatting requirements:

• The answer must be using Times New Roman font (size 12), double spaced, typed, with one-inch margins on all sides.

• The response also includes a cover page containing the student's name, the title of the assignment, the course title, and the date. The cover page is not included in the required page length.

• Also include a reference page. The references and Citations should follow APA format. The reference page is not included in the required page length.

Solution Preview :

Prepared by a verified Expert
Project Management: Outline the steps involved in undertaking a job search
Reference No:- TGS03026153

Now Priced at $70 (50% Discount)

Recommended (91%)

Rated (4.3/5)