Assignment
Apply the concepts of the tools described in the Project Planner's Toolkit.
After studying and evaluating the components included in the Project Manager's Toolkit, evaluate which of the tools (Gantt Chart or Flow Chart) would be most appropriate for each of the following tasks and use that tool to complete the task.
1. Outline the steps involved in undertaking a job search and choosing a job. Include an analysis of the advantages and limitations of the tool as well as ideas for ways you can use the tool in business.
2. Build a schedule showing the steps for planning and preparing for your vacation. Include a description of the advantages and limitations of this tool and ideas for ways you can use it in business.
Format your assignment according to the following formatting requirements:
1. The answer should be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides.
2. The response also include a cover page containing the title of the assignment, the student's name, the course title, and the date. The cover page is not included in the required page length.
3. Also Include a reference page. The Citations and references should follow APA format. The reference page is not included in the required page length.
Attachment:- Toolkit.rar