In this homework, you will create a project management plan (PMP) baseline, which includes a scope (including a WBS), a project schedule, and a project budget. This homework will be divided into four major elements, along with their individual elements.
For your homework,
1. Develop the scope document in MS Word. The scope document should:
• Create a scope description consistent with the authority granted in the project charter.
• List the project deliverables that will enable resolution of the current problems in the current logistics operation.
• Outline the acceptance criteria for each deliverable.
• Establish the project's limitations or boundaries.
• Summarize the change control process that will be used during the project.
2. Create an indented WBS for five to 10 intermediate tasks using ProjectLibre.
3. Include within each intermediate task two to three sub tasks. Review the ProjectLibre Demo video for additional help using ProjectLibre.
4. Develop a project schedule using the WBS you have already created as the starting point. This should be completed using ProjectLibre. The project will start February of Year 0, and should finish in December.
Format your homework according to the give formatting requirements:
• The answer must be using Times New Roman font (size 12), double spaced, and typed, with one-inch margins on all sides.
• The response also includes a cover page containing the student's name, the title of the homework, the course title, and the date. The cover page is not included in the required page length.
• Also include a reference page. The references and Citations should follow APA format. The reference page is not included in the required page length.