On some p charts, the upper and lower control limits are calculated for each individual plot point. The most logical reason for this action is which of the following?
a. Each operator will know where the limits come from.
b. Each sample size must have considerable variation.
c. The process will get better or worse over time
d. Individual inspection results may affect the control chart.