Now on the same graph draw her budget constraint assuming


Assume that the structure of EITC is as follows:

1. During the phase in range, EITC recipients receive an additional 15% of their income for each dollar earned up to a maximum of a $3,000 credit limit.

2. They can earn this $3,000 credit until the phase out range, which begins when they start earning $30,000 or more.

3. During the phase-out range, the credit reduces by 10% until it reaches $0

A. Graph the structure of the EITC with income on the X-axis and the EITC credit on the Y-axis. Clearly label all relevant points on the graph, including the maximum credit, earnings when the credit reaches $0, and earnings at the end of the phase in range and at the beginning and end of the phase out range.

B. Now assume a worker earns $2,000 per week if she works and can work up to 50 weeks a year. Plot a budget constraint for consumption (Y) on the Y axis and hours of Leisure (L) on the X-axis assuming that EITC does not exist.

C. Now, on the same graph, draw her budget constraint assuming EITC exists.

Be sure to label on both the Y and X axes the values for each part of EITC. That is, at how many weeks of work does the phase-in end: what will our worker earn? At how many weeks of work does the phase-out begin and end; how mch does our worker earn at each point?

Solution Preview :

Prepared by a verified Expert
Business Economics: Now on the same graph draw her budget constraint assuming
Reference No:- TGS02277974

Now Priced at $30 (50% Discount)

Recommended (92%)

Rated (4.4/5)