A rock of mass m is thrown straight up. At a particular time during its upward motion, the rock has a speed v1 at a height h1 from the ground. At a later time, the rock's speed is v2 when it is at a height h2 from the ground. What is the expression for the work done by non-conservative forces on the rock? (Use any variable stated above along with the following as necessary: g)