Question - Newhard Company assigns overhead cost to jobs on the basis of 115% of direct labor costs. The job cost sheet for Job 313 includes $38,195 in direct materials cost and $10,700 in direct labor cost. A total of 1,800 units were produced in Jo 313.
A. What is the total manufacturing cost assigned to Job 313?
B. What is the unit product cost for Job 313?