Question 1: Following data relates to a certain project.
a) Construct the network.
b) Find the project duration.
c) Identify the critical path.
d) Find slack at each event.
Question 2: How does network analysis help in project work? Define the given terms:
a) Activity
b) Critical path
c) Slack
Describe your answer with a appropriate example.
Question 3: Details of a project are shown in table
Determine optimal project duration and optimal cost of project.
Question 4: Discuss in brief (i) Total float (ii) Free Float and (iii) Independent Float. Describe the use of floats in CPM network.
Question 5: The characteristics of a project schedule are as given below:
a) Draw the network.
b) If scheduled completion time is equal to the earliest expected time, find total, free and independent floats of each activity. Enter values in a tabular form.
Question 6: Describe CPM for finding critical path, different types of floats of activities of a Project.
Question 7: A network consists of given activities with indicated duration in days:
a) Draw the CPM network.
b) Calculate project duration and identify critical path.