Mng00785 assessment - submit a report illustrating how the


Assignment information

Please note that all assignments are to be submitted online via the assignment submission facility of the MySCU site for this unit. For information about how to submit assignments online please see the information in the 'Assessment Help' portal of your MySCU site. If after reading this information you are still uncertain about the submission process please contact the Student Support Team for clarification.

You must use the electronic Assignment Cover Sheet provided in the Assignments section of MySCU. Download this cover sheet, fill in your details and then make this sheet the first page of your assignment - do not send it as a separate document.

Your assignments must be submitted as Word documents with .doc or .docx extension, text documents with .rtf extension or as .pdf documents. If you wish to submit in any other file format please discuss this with your lecturer well before the assignment submission date.

As part of a University initiative to support the development of academic integrity, assessments may be checked for plagiarism, including through an electronic system, either internally or by a plagiarism checking service, and be held for future checking and matching purposes. In addition, sham referencing is considered academic misconduct, so all references must be relevant and discoverable. Students undertaking this unit should use the Harvard style that includes page numbers for in-text references - (Author Surname Year, page number) - see https://libguides.scu.edu.au/c.php?g=356711&p=2405627 .

Note that students are expected to use the following credible sources for all assessments:

1. the prescribed reading - Kloppenborg (2015);

2. readings under MyReadings on the learning site;

3. PMI documents including the PMBok and the PMI Code of Ethics.

Assignment rationale
The purpose of the assignment is to meet the following objectives of this unit:
- demonstrate a critical understanding of the principles of project management
- identify, interpret and apply the principles of project management to effectively manage a project
- critically analyse, interpret and apply the project management knowledge areas to the various phases of a project as appropriate
- identify, assess and evaluate all the phases associated with a project life cycle and demonstrate an understanding of the activities and interrelationships critical to the successful completion of a project.

The Project

The key criteria to consider in choosing the project is not ‘what the project is' but rather, is there sufficient scope to allow the project team to demonstrate the application of the wide range of tools and techniques introduced throughout each topic area. Project concepts with too narrow a Scope are difficult to expand upon in demonstrating a full range of tools and techniques. However, projects that are initially perceived as being too large or broad in Scope can typically be broken down to produce more than adequate scope for the purposes of this assignment.

Assignment 2: OurProjectReport

In Week 3 your local tutor will assign students into groups of two students to permit the group to collaborate and upload Assignment 2 as a group. To facilitate collaboration, a group wiki will be set up and must be used progressively to complete Assignment 2 (see wiki information below).

It is imperative that students complete the Activities at the end of Topic 3 in the Study Guide.

For Assignment 2,the project team is required to submit a report illustrating how the project team will apply the following knowledge areas that have been learned in this unit to OurProject. The Project Report needs to address the following areas at a minimum:
- WBS
- RACI Chart
- Schedule - Gantt chart and AoN as well as resource levelling
- Budget
- Progress Reporting - 2 methods
- Risk Management
- Change Management
- Communication
- Project closure

Wiki:

In Week 3 your local tutor will assign students to a group. A wiki will be set up within MySCU and access to each group wiki will be limited to the designated two students, the local tutor and the Unit Assessor. No other student can access your group wiki.

The wiki must be used to progressively compile the required parts of Assignment 2 - OurProject Report aligned to the PMBoK knowledge areas. It is required that students place material in the wiki on a set progressive basis. That is, students will be required to place material for example a WBS in the week following the week that the topic is taught. For example, WBS is presented in Topic 5 / Week 5, and therefore students have until the end of Week 6 (Saturday at midnight NSW time) to place material and a WBS into the wiki. If this is not in your group wiki by the applicable Saturday at midnight NSW time, then a daily penalty reduction of 10% of available marks for this particular marking criteria will commence from that time.

It is noted that there are two marking criteria for some of the PMBoK knowledge areas. It is suggested that each student take carriage of one of these elements in the wiki to ensure both are completed and placed in the wiki before the relevant time.

Just prior to the due date for Assignment 2, one student from each group should download all material from the wiki and compile these into the one single document to be uploaded via the A2 turn-it-in portal for grading. There is no need for both students to upload as this will result in 100% match in the originality score.

The maximum word length for this assignment is 4,000 words excluding words used in any charts, templates, forms or diagrams that the project team have used to apply the knowledge areas. If the project team opt to use words to explain how the team have applied a knowledge area you should limit them to one page per knowledge area.

A soft copy of many useful forms will be made available to you on MySCU that project teams can modify and use for the assignment. However a project team can and should design your own forms or use standard forms that are used by an organisation and adapt these to suit your project. The soft copy is provided for the benefit of those students who are not adept at designing forms using a computer. Hand drawn forms can be used as well but they must be neatly drawn.

You are also required to provide a list of references listing all the sources you have referred to in preparing this assignment.

Format for Assignment 2
The format of the formal assignment will be:
- SCU Cover Sheet
- Title page
- Table of contents
- Introduction
- WBS
- RACI Chart
- Schedule
- Budget
- Progress Reporting
- Risk Management
- Change Management
- Communication with Stakeholders
- Project Closure
- Reference list (Harvard referencing style is required)
- Appendix will only include a copy of the first assignment for your grader. All forms, charts, tables and diagrams should be included under the relevant sections of the assignment. The Appendix is NOT graded.

I need an assignment on project management

this assignment is based on the previous assignment no. 1 which i have already submitted and have also attached the file this assignment requires wbs rac1 in a proper manner

4000 words
15 harvard reference

Attachment:- Project Management.rar

Request for Solution File

Ask an Expert for Answer!!
Project Management: Mng00785 assessment - submit a report illustrating how the
Reference No:- TGS01387945

Expected delivery within 24 Hours