Minimize the total time job-machine assignment


In a job shop operation, four jobs may be performed on any of four machines.  The number of hours required for each job on each machine is summarized in the table.  Formulate a linear program to minimize the total time job-machine assignment.

 

Machine

Job

A

B

C

D

1

22

18

32

26

2

22

24

12

16

3

24

30

26

24

4

26

30

28

20