Material cost is 15 per part calculate the manufacture


A punch press stamps 2050 brackets during an 8 hour shift. 2 operators run the machine during the shift. 80 parts were scrapped after testing. Hourly Rate for each operator is overhead is 1.5 times the hourly rate wage. Material cost is $1.5 per part. Calculate the manufacture productivity.