Problem: The Channel Tunnel, linking the United Kingdom and France, was originally planned to cost $100 million. After work had begun and the two excavators were under the English Channel, with $70 million already spent, the estimate of the total bill was revised to $150 million.  At this point the marginal cost of completion was best estimated as?