Manufacturing-production scheduling


Ace Novelty manufactures Giant Pandas and Saint Bernards. Each Giant Panda requires 1.5 yd2 of plush, 30 ft3 of stuffing, and 5 pieces of trim. Each Saint Bernard requires 2 yd2 of plush, 35 ft3 of stuffing, and 8 pieces of trim. The profit for each Panda is $10, and the profit for each Saint Bernard is $15. If 3600yd2 of plush, 66,000 ft3 of stuffing, and 13,600 pieces of trim are available, how many of each of the each of the stuffed animals should the company manufacture to maximize its profit? What is the maximum profit?

Request for Solution File

Ask an Expert for Answer!!
Mathematics: Manufacturing-production scheduling
Reference No:- TGS0542728

Expected delivery within 24 Hours