Question: During the month of February, direct labor cost totaled 13,000 and direct labor cost was 40% of prime cost. If total manufacturing costs during February were 90,000, the manufacturing overhead was:
(a) 36,000
(b) 57,500
(c) 77,000
(d) 19,500