1. Rate a job you have had using Hackman and Oldham's core job characteristics (see page 413) on a scale from 1 to 10. What is your total score? What about the job could have been changed to make you give it a higher score?
2. Make a process chart for changing the right rear tire on an automobile.
3. Draw an activity chart for a machine operator with the following operation. The relevant times are as follows:
Prepare mill for loading (cleaning, oiling and so on)
|
.50 min
|
Load mill
|
1.75 min
|
Mill operating (cutting material)
|
2.25 min
|
Unload mill
|
.75 min
|