Question 1: Identify and discuss some of the main elements of lean thinking and just-in-time.
Question 2: How can these concepts be used for effective planning and control of an operation?
Question 3: How are these two concepts (lean thinking and just-in-time) different from the materials requirements planning (MRP) system?
Question 4: How can these differences be overcome to achieve the benefits of both lean thinking/ JIT and an MRP system?