1. Low hanging fruit” refers to apparent quality problems that have existed for some time and past attempts to correct them have failed. T or F?
2. It is advocated in Six Sigma that design features and characteristics be dominated by engineering considerations rather than by customer requirements. T or F?
3. In Six Sigma, a problem is defined as a deviation between what should be happening and what actually is happening that is important enough to need correcting. T or F?