kody corporation uses a job-order costing system


Kody Corporation uses a job-order costing system with a plantwide overhead rate based on machine-hours. At the beginning of the year, the company made the following estimates:




Machine-hours required to support estimated production 156,000
Fixed manufacturing overhead cost $ 660,000
Variable manufacturing overhead cost per machine-hour $ 4.20

Required:
1.
Compute the predetermined overhead rate. (Round your answer to 2 decimal places. Omit the "$" sign in your response.)

Predetermined overhead rate $ per MH

Request for Solution File

Ask an Expert for Answer!!
Basic Statistics: kody corporation uses a job-order costing system
Reference No:- TGS0155094

Expected delivery within 24 Hours