Isys201 it infrastructure assessment - the isys201


IT Infrastructure Assessment -

Background - The management of AusEd has decided to review the existing information technology infrastructure to cater for the increasing demand for better services for both staffs and students. Assume that you are the IT Infrastructure manager for AusEd. Further, you were assigned the responsibilities to review the exiting IT Infrastructure for the purpose of creating a proposal for a new IT infrastructure.

Your Project

Please read the case study for AusEd posted in the LEO. The ISYS201 assessment is about creating an overall IT Infrastructure proposal for AusEd. The proposal is an overview of the entire IT infrastructure to be presented to the AusEd management for future planning. The proposal will include IT Infrastructure diagram of the overall system.

The diagram will include network infrastructure, all types of servers and clients as well as where they are located within the network. Indicate the presence of security features such as firewalls, VPNs.

Finally, describe in detail the reason for the hardware choice and describe how the various sections of the plan serve the business needs of the internal and external users of the system.

Points you need to include, but not limited to, as follows:

1. Project Preliminaries Description

2. Purpose and scope of the problem space as well as business context

3. Scope of the system descriptions and assumptions

4. Appropriate System design by using suitable schematic diagrams

5. A complete list of equipment, devices necessary for the design.

6. A cost analysis of the proposed Infrastructure design.

7. Justification for the chosen hardware.

8. Consider and apply techniques for achieving sustainable global economy and environmental responsibilities, e.g. e-waste, green IT consideration.

9. Word limit, 2000 words.

10. The report must be submitted in MS-Word format

11. Appendix (bibliography, glossary of terms)

Attachment:- Assignment Files.rar

Request for Solution File

Ask an Expert for Answer!!
Management Information Sys: Isys201 it infrastructure assessment - the isys201
Reference No:- TGS02789324

Expected delivery within 24 Hours