In calculating the risk associated with two potential projects (A & B), which of the following statistical calculations indicates that the projects are equally risky?
The standard deviation ofA is 100, and the coefficient of variation of A is 80.912
The standard deviation of B is 1,000, and the coefficient of variation of B is 809.12
The variance of A’s possible outcomes is 258.10, and the standard deviation of A is 100
The variance of B’s possible outcomes is 2,581, and the standard deviation of B is 1,000
iii and iv
ii and iii
i and ii
i and iv
None of the above