1) In a resource requirements plan, the load profile is based on which of the following?
A) Lot size of a typical product
B) The lot size of each product
C) One unit of the typical product
D) One unit of each product
2) If the setup time does not change, which of the following can be expected to occur when lot sizes decrease?
i. Lead time for each lot will be reduced.
ii. Total capacity needs will increase.
iii. Capacity requirements will move into the future.
iv. Manufacturing costs will decrease.
A) I and III only
B) II and IV only
C) I, II, and III only
D) I, II, III, and IV