Determine single sampling plans that will accept lots that are 0.8% nonconforming with a probability of 0.96. Use acceptance numbers of 1, 3, and 4.
If we desire batches that are 5% nonconforming to be accepted with a probability of no more than 0.04, which of the plans above would be preferable? Will the plan meet this criterion?