If the preliminary assessment of control risk indicates


If the preliminary assessment of control risk indicates that the risk may be below the maximum level and the assessment would reduce overall audit time and effort, then the auditor must test these controls further to determine the appropriateness of their design and effectiveness. How is this testing of controls carried out in an audit?

Request for Solution File

Ask an Expert for Answer!!
Operation Management: If the preliminary assessment of control risk indicates
Reference No:- TGS02526597

Expected delivery within 24 Hours