1. Why might a U.S. firm prefer to engage in DFI in Mexico rather than Canada (assume there is no expected volatility in either currency nor is either country offering incentives)?
2. If project gives returns above the firm’s required rate of return then NPV is
3. If the NPV is negative then IRR is