Identify what other types of work activities might included


Homework: Integrative Case- Hudson Jewelers

For this homework, you will practice drawing a network diagram; determine the project completion time, critical path(s), activity slack times; and create a Gantt chart for a specific project. You will reflect on what insights this information provides and consider the types of work activities that should be included in a comprehensive work breakdown structure.

For this homework, refer to the Case Question for discussion in Operations and Supply Chain Management, Chapter 19: Project Management, Chapter Review: Integrative Case: Hudson Jewelers (page 606).

Be sure to include the following critical elements in your submission:

• Draw the network diagram
• Determine the project completion time, critical path(s), and activity slack times
• Create a Gantt chart for the project
• Summarize your insights
• Identify what other types of work activities might be included in a more comprehensive work breakdown structure.

Format your homework according to the give formatting requirements:

• The answer must be using Times New Roman font (size 12), double spaced, typed, with one-inch margins on all sides.

• The response also includes a cover page containing the student's name, the title of the homework, the course title, and the date. The cover page is not included in the required page length.

• Also include a reference page. The references and Citations should follow APA format. The reference page is not included in the required page length.

Solution Preview :

Prepared by a verified Expert
Operation Management: Identify what other types of work activities might included
Reference No:- TGS03115492

Now Priced at $45 (50% Discount)

Recommended (90%)

Rated (4.3/5)