Identify some of the problems that critics have listed


Assignment

Case Study The Navy Scraps Development of Its Showpiece Warship-Until the Next Bad Idea

a) The U.S. Department of Defense has a long history of sponsoring projects that have questionable usefulness. If you were assigned as a member of a project review team for a defense project, what criteria would you insist such a project has in order to be supported? In other words, what are the bare essentials needed to support such a project?

b) Why, in your opinion, is there such a long history of defense projects overshooting their budgets or failing some critical performance metrics? (Consider other project cases in this text, including the Expeditionary Fighting Vehicle discussed.)

c) "The mystery is not that the Zumwalt was canceled. The mystery is why it took so long for it to be canceled." Do you agree with this Assignment? Why or why not?

d) Google "criticisms of the Littoral Combat Ship" and identify some of the problems that critics have listed. In light of these problems, why do you think the Navy has pressed ahead with the development of the LCS?

Format your assignment according to the following formatting requirements:

i) The answer should be typed, using Times New Roman font (size 12), double spaced, with one-inch margins on all sides.

ii) The response also includes a cover page containing the title of the assignment, the student's name, the course title, and the date. The cover page is not included in the required page length.

iii) Also include a reference page. The Citations and references must follow APA format. The reference page is not included in the required page length.

Attachment:- APA-Template.rar

Solution Preview :

Prepared by a verified Expert
Project Management: Identify some of the problems that critics have listed
Reference No:- TGS03027369

Now Priced at $60 (50% Discount)

Recommended (97%)

Rated (4.9/5)