Identify defective components in a batch escape


Problem: Components arriving at a distributor are checked for defects by two different inspectors (each component is checked by both inspectors). The first inspector detects 99% of all defectives that are present, and the second inspector does likewise. At least one inspector does not detect a defect on 2% of all defective components. What is the probability that the following occur?

(a) A defective component will be detected only by the first inspector?

A defective component will be detected by exactly one of the two inspectors?

(b) All three defective components in a batch escape detection by both inspectors (assuming inspections of different components are independent of one another)?

Request for Solution File

Ask an Expert for Answer!!
Other Subject: Identify defective components in a batch escape
Reference No:- TGS03343542

Expected delivery within 24 Hours