Consider the conduct of a marriage (any Community you are familiar with) as a project and out line the work break down structure under each phase of the project life cycle. With the help of this work break down structure do the following.
1. Identify all possible risks that you can think of under each phase.
2. Analyze each risk for its impact on the project as well as the probability of its occurrence.
3. Draw a detail risk response structure for each of the risks identified.
4. As contingency plan Work out an alternative plan for each of the risk responses.
5. Which of the risks you would monitor and control.