Identify a project that is in works for your organizations


Assignment: The Role Of Risk In Change Management

Resource: The Exercise Files in the "Identifying Project Risks"

Identify a project that is in the works (or has been completed) for one of your own organizations (or one that can be researched).

Develop a qualitative 3x3 risk matrix and a risk-response plan for the risks identified.

Identify 4 to 6 risks.

Write a 700- to 1,050-word paper, using a minimum of two peer reviewed sources.

Format your assignment according to the following formatting requirements:

1. The answer should be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides.

2. The response also includes a cover page containing the title of the assignment, the student's name, the course title, and the date. The cover page is not included in the required page length.

3. Also include a reference page. The Citations and references should follow APA format. The reference page is not included in the required page length.

Solution Preview :

Prepared by a verified Expert
Business Management: Identify a project that is in works for your organizations
Reference No:- TGS02982003

Now Priced at $40 (50% Discount)

Recommended (91%)

Rated (4.3/5)