Identification of hazards and risks in the workplace job


Risk Management Project 2 In this project, you will be given the opportunity to demonstrate your understanding of the risk management concepts covered in this and previous units in the course. Select a real or imagined workplace setting that involves hazards created by two or more of the hazard sources discussed in Chapters 14-27. Your assignment is to identify and assess the risks in this workplace, propose tactics for reducing the risks, and evaluate the residual risks. Your submission should include the following:

· A brief description of the workplace setting and an explanation of the tasks in this workplace.

· Identification of hazards and risks in the workplace; Job Hazard Analysis (JHA), Failure Modes and Effects Analysis (FMEA), or Fault Tree Analysis are to be used, or some combination of these techniques.

· Assessment of the identified risks before risk reduction efforts are applied, using a 5x5 Risk Assessment Matrix.

· Identification of risk reduction tactics to be applied with a brief justification for each tactic selected; multiple tactics can be applied to each risk if needed.

· Re-assessment of the risks after tactics are applied, using a 5X5 matrix.

· Discussion of the residual risks, and whether you feel they are at a tolerable level. The project must be a minimum of four pages, and a maximum of seven pages in length, not including the title, abstract, and reference pages. Use APA formatting where applicable.

Solution Preview :

Prepared by a verified Expert
HR Management: Identification of hazards and risks in the workplace job
Reference No:- TGS01710434

Now Priced at $60 (50% Discount)

Recommended (92%)

Rated (4.4/5)